1-787-905-7575 service@cortesindustrial.com En Español

Static wear ring installation in a submersible pump volute

Location: San Juan PR Return to Projects

Client: Aqueduct and Sewage Authority

  • The Puerto Nuevo wastewater treatment plant serves the municipalities of San Juan, Trujillo Alto, and portions of Bayamón, Guaynabo and Carolina.
  • This plant is designed to treat an average hydraulic load of 72 million gallons per day (MGD) and a maximum hydraulic load of 144 MGD.
  • To ensure the efficient operation of one of the plant's 37,000-gallon-per-minute, Cortes Industrial installed one of the critical elements of the pump “on-site”.
  • This critical element, the “wear ring”, was also manufactured in our workshop.